@ Copyright 2017 Lunsford Associates, LC

PUBLIC SECTOR

Bryson Lake Storage Expansion
Location:
Midlothian, Texas

Services:

    ▪ Increased detention storage of the lake to reduce the water surface elevation to 
      pre-development conditions
    ▪ As-Built lake stage-storage calculations were performed to verify volume
Water and Sewer Renewals Division Street, Pioneer Parkway, Meadowbrook
& Clubview Addition CR06-018

Location: Arlington, Texas

Services:

    ▪ Design for removal and/or replacement of 5600 feet of 6”-12” water lines and 7100 feet
      of sanitary sewer lines in Division Street, Pioneer Parkway (SH 303), St. John Street,
      Wynn Street, Meadobrook Addition, and Clubview Addition
    ▪ Street rehabilitation for selected streets
    ▪ Project included a combination of removal and replacement, pipe bursting, and bore
      method for sanitary sewer lines

Loch Lomond Drainage & Pavement Rehabilitation & Live Oak Lane

Utility Replacement

Location: Arlington, Texas
Services:

    ▪ Design Surveys

    ▪ Preliminary drainage study and final design and plan production for drainage and

      paving rehabilitation improvements in the Loch Lomond project vicinity

    ▪ Design for water and sanitary sewer line replacement in Live Oak Lane, and utility

      relocations and adjustments in Loch Lomond Drive, Loch Lomond Court & Crowley Rd

blue_2086.png

Great Southwest Parkway Extension & BNSF Railroad Crossing from Lone Star Boulevard to BNSF Unit Train Terminal
Location:
Fort Worth, Texas

Services:

    ▪ Design Surveys & Easement Documents

    ▪ Preliminary design & opinion of cost for street, drainage & utilities and managed final   
      design of street paving, drainage and utilities

    ▪
 4500 feet extension included crossing of BNSF Railroad
Center Drive Pavement Repairs
Location: Midlothian, Texas
Services:

    ▪ Design and construction phase services for street rehabilitation for selected streets   
      including a combination of removal and replacement
Texas Central Business Lines Hwy 67 Driveway Access
Location: Midlothian, Texas
Services:

     ▪ Site grading, paving, and drainage plans for driveway access to Texas Hwy 67 
       frontage road 
     ▪ Analysis of the upstream and down stream drainage conditions were performed to 
       accommodate proposed conditions

Abrams Road: Jimat to Cooper Water and Sewer Replacement 

Location: Arlington, Texas

              Services:

   ▪ Street reclamation and partial drainage improvements funded by Public Works

     and Transportation Department

   8” water and 8” sanitary sewer improvements within the street limits and approx. 4700 ft

     of street reclamation, partial curb & gutter replacement


  
Lakebrook Culvert and Drainage Improvements
Location:
Arlington, Texas

Services:

    ▪ Design Surveys & Easement Documents

    ▪ Replacement of the deficient culvert in Lakebrook Drive with a multiple box culvert, 
      upstream and downstream channel improvements including gabion channel lining and
      retaining walls
    ▪ Street rehabilitation of Lakebrook Drive and utility adjustments
 Paradise I.S.D. Wastewater Treatment Plant & Collection Lines
Location: Paradise, Texas

Services:

    ▪ Assisted with TWDB SRF preliminary funding application for 2013 for wastewater 
      treatment plant and collection lines project 

STORM DRAINAGE

STREETS / PAVING

WATER & WASTEWATER

Arbrook Plaza Nursing & Rehabilitation
Location: Arlington, Texas

Services:

    ▪ Civil plans including water & sanitary sewer utilities, storm drainage system
    ▪ Detention pond, site paving and erosion control for four acre nursing home project
100_2494_-_Copy.JPG100_2541.JPG100_2597.JPGDSCN2765.JPGdsgn_1441__2372.jpgdsgn_1441_img_1.jpg

Green Oaks Blvd. Addition of 5th & 6th Lanes from Fielder Rd to Lincoln Blvd

Location: Arlington, Texas
Services:
     ▪ Design Surveys

     ▪ Civil plans for additional 5th & 6th lanes to existing four lane boulevard

Abrams Road: Jimat to Cooper  Street Reclamation

Location: Arlington, Texas
Services:

     ▪ Design Surveys

    ▪ Civil design for street reclamation and partial drainage improvements funded by Public

      Works and Transportation Department

    ▪ Approximately 4700 feet of street reclamation, partial curb and gutter replacement,

      partialstorm drainage improvements

    8" water and 8" sanitary sewer improvements within the street limits


Mill Creek Sanitary Sewer Replacement
Location: Arlington, Texas

Services:

    ▪ Project Manager and design for replacement of 6,400 feet of sanitary sewer
      collection lines  
   ▪ Project included a combination of removal and replacement, pipe bursting, and bores 
Water Distribution System Study
Location: Balch Springs, Texas

Services:

    ▪ Developed hydraulic model & mapping for existing system and future conditions

      

      for water district with 5700 customers
    
▪ Scope included identification of system deficiencies and development of a

      capital improvement plan to enhance distribution system 

Wastewater Collection System Capacity Study
Location: Balch Springs, Texas

Services:

    ▪ Evaluation of existing line capacity of major wastewater lines, coordination and

      review of flow measurement, identification of deficiencies and recommendations    

      for improvements for major wastewater trunk lines


American Way, Patriot Drive & Park Avenue Extension
Location: Midlothian, Texas
Services:

    ▪ Design Surveys & CA Services   

    ▪ Concrete road design extensions for selected streets including storm drainage, water

      and sanitary sewer

US 287 Acceleration/Deceleration Lane/Driveway Improvements
Location: Mansfield, Texas
Services:

     ▪ Design & CA for concrete entrance and acceleration/deceleration lane

    ▪ Improved design to encourage smooth increases in traffic flow

    ▪ TXDoT Permit Applications

 

LUNSFORD 
A S S O C I A T E S , L C

NAVY_BLUE_2721.pngblue_1113.pngDSCN0297.JPGPicture_020_5469.jpgdsgn_1441__8930.jpgdsgn_1441__8930.jpgdsgn_1441__8930.jpgdsgn_1441__1760.jpgDSCN1642.JPGPicture_015_%282%29.jpgAbram-Completed.jpgDSCN2629_8389.JPGIMG_9671.JPGMusketBNSF_Ethanal_Terminal_Ft_Worth_Grand_Opening_062_5803.jpg100_2130.JPG